|
Spokane
River- Long Lake
|
The CE-QUAL-W2 Model Version 3.1 has been
applied to the
# |
File |
Comment |
File Size |
Posted |
1 |
for 1991
and 2000 - FINAL VERSION |
10 MB |
February
24, 2003 |
|
2 |
for 1991
and 2000 - FINAL VERSION |
2 MB |
March 23,
2003 |
|
3 |
for 1991 |
3.4 MB |
March 17,
2003 |
|
4 |
for 2000 |
3.9 MB |
March 17,
2003 |
|
5 |
Presentation
of 2000 data |
2.3 MB |
December
11, 2002 |
|
6 |
for 2001
- FINAL VERSION |
3 MB |
February
24, 2003 |
|
7 |
for 2001
- FINAL VERSION |
1.4 MB |
March 23,
2003 |
|
8 |
for 2001
- FINAL VERSION |
5 MB |
March 17,
2003 |
|
9 |
for 2001 |
16 MB |
February
25, 2003 |
|
10 |
FINAL
VERSION |
2 MB |
February
24, 2003 |
Washington Ecology reviewed the 2001 calibration
and suggested further changes in the model. As a result, Washington Ecology
contracted with PSU to review their changes and to suggest further improvements
in the model calibration for 2001. For questions, please contact Bob Cusimano,
Washington Department of Ecology, at bcus461@ecy.wa.gov. The report below is a summary of that
review:
# |
File |
Comment |
File Size |
Posted |
11 |
for the
2001 calibration |
2 MB |
February
3, 2004 |
|
12 |
for the
2001 calibration |
5 MB |
January
22, 2004 |
|
13 |
for the
2001 calibration |
5 MB |
January
22, 2004 |
The
# |
File |
Comment |
File Size |
Posted |
14 |
2001 and
2004 calibration |
6 MB |
November
2, 2005 |
|
15 |
for 2001 |
1.5 MB |
November
2, 2005 |
|
16 |
for 2004 |
1.5 MB |
November
2, 2005 |
Washington Department of Ecology TMDL
Scenarios, August 2007.
# |
File |
Comment |
File Size |
Posted |
17 |
Background
Inputs |
7.0 MB |
August 23, 2007 |
|
18 |
CBOD at
2001 levels, dissolved P at Background
Levels |
7.0 MB |
August 23, 2007 |
|
19 |
CBOD at
2001 levels, dissolved P 2.5 Times
background levels |
7.0 MB |
August 23, 2007 |
|
20 |
CBOD and
dissolved P at 2001 levels |
6.4 MB |
August 23, 2007 |